Menu

Online enquiry form

Complete and send the form and we will call you back as soon as possible.

All fields are required including full names.

Sector of interest:

Supply and installation

As soon as the specification for your flooring is agreed, we then do the leg work to make sure your flooring is supplied on time and installed to the highest standards.

Preparation is key to ensuring your flooring is laid correctly and to maximise its lifespan. We can take care of sub-floor preparation and other specialist preparation.

Supply. We have our own central warehouse facility which means we’re able to pre-cut, prepare, wrap and label everything before it leaves our warehouse. This is key to reducing waste and also helps to minimise manual handling risks. Our fleet of vehicles are tracked, which means we can co-ordinate everything and everyone to arrive on site together.

Installation. Because we’re in control, your team can plan more effectively knowing that we’ll be there on time, ready to get on with the job. Our fitting teams are efficient and will install the flooring with the minimum of fuss to make sure the project is completed on time and to the highest standards.


Supply and Installation an HFC Fitter at work
Contact us on 01753 58 38 38 or email enquiries@hillingdonflooring.co.uk